P041 Grid sensing infrastructure and hard caps
What grid-sensing infrastructure exists (digital relays, phasor sensors, control-system deadbands) and what hard regulatory caps bound a hidden load's size?
Grid sensing infrastructure and hard caps that bound hidden load.
Terms: PMU (phasor measurement unit): a sensor that samples grid voltage and current very precisely and time-stamped. SCADA: a utility's supervisory control-and-data system; a 'deadband' is a change too small for it to report. LEA (low-energy analog) sensor: a voltage or current sensor whose small analog output feeds a protective relay directly (IEEE C37.92). Rogowski coil: a clip-on current sensor.
Status
Posed
Posed by
- Canary Institute research
Also raised in: Moon, Vedula, Geneson & Bar-on (2025), Strategies and Detection Gaps in a Game-Theoretic Model of Compute Governance (RAND RRA3686-1).
Sub-questions
| ID | Sub-question | What the sources report |
|---|---|---|
| P041.1 | Over several weeks, what is a feeder relay's step repeatability (% of reading) against a reference meter? | open |
| P041.2 | What share of US distribution feeders have digital relays, and what share LEA/Rogowski sensors? | open |
| P041.3 | What is the smallest current step that typical SCADA deadband settings pass at a stated reporting interval? | open |
| P041.4 | Behind battery-inverter smoothing, what is the minimum detectable island (kW) at 1-10 Hz metering? | partly answered |
| P041.5 | What periodic load swing (MW) at a site is detectable at a PMU a given electrical distance away, against ambient noise? | open |
| P041.6 | Using the ODEC radial 69 kV cap and EIA-861, what average peak kW per customer does it bound? | a source suggests an answer (not checked) |
| P041.7 | Does an AESO rule set +-160 kW and 16 kW-per-100 ms variability limits for large loads, and at what connection level? | open |
| P041.8 | Does a per-account average-power threshold (a stated level) separate training from other large tenants with FPR below a stated bar? | implied by a source, not stated as open |
Possibly relevant work found by automated search
Found by AI agents searching for this problem's sub-questions, mostly by keyword and citation in the OpenAlex scholarly database and on the web; a second AI pass reviewed each one, and we spot-checked some by hand. They seemed reasonably related, as far as one can tell from outside each paper's field. Some come from neighbouring fields, such as arms control and financial audit, and bear on the problem by analogy. Not reviewed against the status above; a paper listed here does not change that status. 928 of 1052 quotes checked word for word against the paper's text.
For P041.1: Over several weeks, what is a feeder relay's step repeatability (% of reading) against a reference meter?
For P041.2: What share of US distribution feeders have digital relays, and what share LEA/Rogowski sensors?
For P041.4: Behind battery-inverter smoothing, what is the minimum detectable island (kW) at 1-10 Hz metering?
For P041.5: What periodic load swing (MW) at a site is detectable at a PMU a given electrical distance away, against ambient noise?
* Full text not reviewed; more likely to contain errors.
Data
- problems.csv — one row per problem
- problem_status.csv — status, scope and evidence per problem
- problem_sources.csv — the posed-by quote and other documents per problem
- leaves.csv — all sub-questions, including those without a checkable form
- leaf_sources.csv — every source row behind each sub-question