P122 Field capacity, funding and deployment readiness
What does the verification field need, in funding, people and manufacturing capacity, to reach deployment, and how does that compare with what exists?
Field funding, capacity and deployment readiness.
Status
Analyzed Funding only, as a proponent's unsourced figures: a $50 to 150M capitalisation recommended for one central project, against 'less than $15M' spent on verification technologies to date (same document, AI-lab section). People and manufacturing capacity are not estimated: the companion SITREP lists 'preparing plans for quick and secure scaled-up manufacturing' as an extension and Proofworks notes a multi-month manufacturing buffer. No survey of the field's funding or headcount.
Fund a large central project to “own” Plan A verification. Their goal should be to ensure AI verification technology can be deployed in early 2029. The remit would cover not just the R&D but also the stockpiling and planning for scale-out. Before the end of 2026, they should be capitalised with at least $50-150M, and as the project succeeds, they should expect to scale to absorb more funding.
Raised in: AI Security Forum, Requests for Discussion; Amodo (2026), AI 2040 Plan A — How You Can Help; Amodo (2026), AI 2040 Plan A — Verification SITREP; Proofworks, Living Verification Documents.
Sub-questions
| ID | Sub-question | What the sources report |
|---|---|---|
| P122.1 | What is the total disclosed funding for AI-verification technology through mid-2026? | implied by a source, not stated as open |
| P122.2 | How many tap/SNG-class devices per month could be manufactured from a cold start, and what buffer does that force? | open |
Sub-questions not yet stated precisely enough to check
| ID | Sub-question |
|---|---|
| P122.3 | Should a central verification project be capitalized with $50–150M before end 2026? |
| P122.4 | Which R&D projects can be handed off to lower-context research organizations? |
| P122.5 | By when could the sketched verification system be built, tested and deployed at scale in real datacenters? |
Possibly relevant work found by automated search
Not searched: no technical result was expected for this problem.
Data
- problems.csv — one row per problem
- problem_status.csv — status, scope and evidence per problem
- problem_sources.csv — the posed-by quote and other documents per problem
- leaves.csv — all sub-questions, including those without a checkable form
- leaf_sources.csv — every source row behind each sub-question